Our last post was September 9, but we have not been idle all this time: We hung all three
interior doors, got the last section of
interior wall up (I'm awaiting my table saw so I can trim out the interior, so there is a gap across the top of the wall dividing the living area from bathroom/closet/bedroom), run some
wire under the cabin, put up some
power receptacles,
caulked all the interior, added
supports for the angle braces under the loft, and
drilled holes for running wire inside the cabin. The
plumber has finished getting water to the cabin, all the lines for indoor fixtures, and the requisite on/off and drain valves. Alisanne has
painted one interior door and the vanity for the bathroom. While much has been accomplished, there is still much work to do. But, we
need that table saw! Here are some photos to bring you up to date. More are available at our
Picasa site, link at right.