Our last post was September 9, but we have not been idle all this time: We hung all three interior doors, got the last section of interior wall up (I'm awaiting my table saw so I can trim out the interior, so there is a gap across the top of the wall dividing the living area from bathroom/closet/bedroom), run some wire under the cabin, put up some power receptacles, caulked all the interior, added supports for the angle braces under the loft, and drilled holes for running wire inside the cabin. The plumber has finished getting water to the cabin, all the lines for indoor fixtures, and the requisite on/off and drain valves. Alisanne has painted one interior door and the vanity for the bathroom. While much has been accomplished, there is still much work to do. But, we need that table saw! Here are some photos to bring you up to date. More are available at our Picasa site, link at right.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment